← All Tools
Free Tool
Cost Estimator
Select your location first. Land area inputs will show the local unit system automatically.
Inputs
LiveLocation
Land Area
Ropani systemRopani
Aana
Paisa
Dam
= 0 sqft of land
Coverage
60%40% minimal80% maximal
Built-up area per floor: ~0 sqft
Number of Floors
Finish Level
Estimated Total Cost
Enter land area
Total Floor Area
0 sqft
Rate per Sqft
NRs 3,500-5,000
Location Factor
100%
Cost Breakdown
Structure & Foundation
NRs 035%
Masonry & Brickwork
NRs 025%
Roofing
NRs 010%
Electrical
NRs 08%
Plumbing
NRs 08%
Finishing & Fixtures
NRs 014%
Your Inputs
0 Aana60% coverage2 floorsStandardKathmandu
This is a rough estimate only. Actual costs vary based on soil conditions, design complexity, material availability, and contractor rates. Get a precise quote from our team for an accurate budget.