← All Tools

Free Tool

Cost Estimator

Select your location first. Land area inputs will show the local unit system automatically.

Inputs

Live

Location

Land Area

Ropani system

Ropani

Aana

Paisa

Dam

= 0 sqft of land

Coverage

60%
40% minimal80% maximal

Built-up area per floor: ~0 sqft

Number of Floors

Finish Level

Estimated Total Cost

Enter land area

Total Floor Area

0 sqft

Rate per Sqft

NRs 3,500-5,000

Location Factor

100%

Cost Breakdown

Structure & Foundation
NRs 035%
Masonry & Brickwork
NRs 025%
Roofing
NRs 010%
Electrical
NRs 08%
Plumbing
NRs 08%
Finishing & Fixtures
NRs 014%

Your Inputs

0 Aana60% coverage2 floorsStandardKathmandu

This is a rough estimate only. Actual costs vary based on soil conditions, design complexity, material availability, and contractor rates. Get a precise quote from our team for an accurate budget.